Whitetail Lake Access Road Improvements
West of Canal Flats, British Columbia
Project Description
SweetTech was obtained by the Whitetail Lake Land Corporation (WLLC) to provide detailed engineering, regulatory approvals and construction inspection services for the required improvements to the Findley Creek Forest Service Road and the Whitletail Lake Access road. These improvements were completed to service the future resedential development works at Whitetail Lake supported by SweetTech.
Archeological sensitive areas, wetland area and an active forestry haul road with fishing boat and trailer traffic added to construction challenges. These were mitigated by an effective traffic management and limited construction works zones.
A fit for purpose design and practical construction execution achieved the permitted road widening criteria with immediate positive feedback, “ the road feels so much safer”.
Key Elements
Client
Whitetail Lake Land Corp.
Timeline
November 2013 - October 2014
Capital Cost
$600,000
Engineering Services
- EPCM Scope of work
- Digital Terrain Modelling
- Conceptual Design
- Detailed design
- Prepare subcontractor work packages
- Co-ordinate all regulatory approvals
- Full time construction administration, management, and inspection
