Our website has a new look

·

Our website has a new look

·

Elbow River Hydrometric Monitoring Station Upgrades

·

Complete

·

Bragg Creek, Alberta

Image loading

Wilco excavator with erosion control measures during flow gauge station construction on Elbow River in Bragg Creek

Image loading

Wilco excavator with erosion control measures during flow gauge station construction on Elbow River in Bragg Creek

Image loading

Wilco excavator with erosion control measures during flow gauge station construction on Elbow River in Bragg Creek

Image loading

Completed riprap erosion protection along Elbow River with concrete wall at dusk near Bragg Creek

Image loading

Completed riprap erosion protection along Elbow River with concrete wall at dusk near Bragg Creek

Image loading

Completed riprap erosion protection along Elbow River with concrete wall at dusk near Bragg Creek

Client

Wilco Contractors Soutwest

Wilco Contractors Soutwest

Capital Cost (CAD)

Not Disclosed

Not Disclosed

Location

Bragg Creek, Alberta

Bragg Creek, Alberta

Role/Position

Sub-Consultant

Sub-Consultant

Duration

June 2021

June 2021

September 2021

September 2021

Description

SweetTech was retained by Wilco Contractors Southwest Inc. (Wilco) to provide Erosion and Sediment Control (ESC) support for the decommissioning of an existing flow gauge station and the construction of a new flow gauge station, located in Bragg Creek. The engineering services provided prior to, and during the construction phase of this project included: development of good ESC housekeeping practices for construction, erosion and sediment control plans, dewatering supervision and reporting, and engineering support for sensitive works. SweetTech was able to adapt ESC and dewatering measures quickly and effectively to satisfy numerous stakeholder requests throughout the design process, enabling the project to be completed with a short turnaround.​

During all dewatering activities on-site engineering support and supervision was provided by SweetTech to confirm regulatory and stakeholder compliance was achieved. A detailed observation report was provided to Wilco at the end of dewatering operations. Working with Applied Aquatic Research, our combined services on this project were able to fully support Wilco, Rocky View County, and the City of Calgary’s environmental requirements.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Wilco excavator conducting dewatering operations with pump system for flow gauge station construction on Elbow River

Image loading

Wilco excavator conducting dewatering operations with pump system for flow gauge station construction on Elbow River
Wilco excavator conducting dewatering operations with pump system for flow gauge station construction on Elbow River

Image loading

Wilco excavator conducting dewatering operations with pump system for flow gauge station construction on Elbow River
Wilco excavator conducting dewatering operations with pump system for flow gauge station construction on Elbow River

Image loading

Wilco excavator conducting dewatering operations with pump system for flow gauge station construction on Elbow River
Construction crew installing dewatering infrastructure under SweetTech engineering supervision at Elbow River gauge station site

Image loading

Construction crew installing dewatering infrastructure under SweetTech engineering supervision at Elbow River gauge station site
Construction crew installing dewatering infrastructure under SweetTech engineering supervision at Elbow River gauge station site

Image loading

Construction crew installing dewatering infrastructure under SweetTech engineering supervision at Elbow River gauge station site
Construction crew installing dewatering infrastructure under SweetTech engineering supervision at Elbow River gauge station site

Image loading

Construction crew installing dewatering infrastructure under SweetTech engineering supervision at Elbow River gauge station site

Featured project media produced by SweetTech.

Have a project you want to discuss?

Have a project you want to discuss?

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.