Our website has a new look

·

Our website has a new look

·

Kananaskis Country Golf Course Infrastructure Assessment

·

In-Progress

·

Kananaskis, Alberta

Image loading

Image loading

Image loading

Image loading

Image loading

Image loading

Client

Ground Cubed

Ground Cubed

Capital Cost (CAD)

TBD

TBD

Location

Kananaskis, Alberta

Kananaskis, Alberta

Role/Position

Sub-Consultant

Sub-Consultant

Duration

October 2025

October 2025

Present

Present

Description

Being located within Evan-Thomas Provincial Recreational Area (PRA), Alberta Forestry and Parks (AFP) is responsible for all infrastructure and capital upgrades related to the world-class Kananaskis Country Golf Course (KCGC). The KCGC is located in the heart of the Rocky Mountain hosting two pristine, 18-hole, championship courses. The KCGC also includes several auxiliary facilities including a club house, administration office, pro shop and golf cart parkade, tournament pavilion, maintenance shop, and staff housing – as well as parking lots, roads, and utilities to support operations. The facility was constructed in 1983 and, since then, multiple upgrades and additional assets and services have been installed. The condition, integrity, and location of these assets are currently unknown.

A multi-disciplinary consultant team, led by groundcubed, was formed to complete a Level 2 Infrastructure Condition Assessment of the KCGC assets. SweetTech's scope included seven (7) elements defined in the AFP Condition and Performance Rating Manual: Roadways and Parking, Water Distributions, Water Transmission, Sanitary Collection, Lift Station, Weirs, and Culverts. SweetTech collaborated with the AFP, groundcubed, and specialized subcontractors to complete a literature review, detailed site inspection, interviews with site operators, and a closed circuit television inspection of sanitary sewer tie-ins. The results were presented using a rating system that integrated the overall asset condition, component conditions, remaining useful life, and recommended capital interventions at a Class D level of cost estimation.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Aerial perspective of Widowmaker parking facility and river access trail surrounded by forest

Image loading

Aerial perspective of Widowmaker parking facility and river access trail surrounded by forest

Image loading

Aerial perspective of Widowmaker parking facility and river access trail surrounded by forest

Image loading

Featured project media produced by SweetTech.

Have a project you want to discuss?

Have a project you want to discuss?

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.