Canmore Nordic Center Snow Making System Upgrades

·

In-Progress

·

Canmore, Alberta

Image loading

Pipeline construction for Canmore Nordic Centre snowmaking system with excavation and equipment in Rocky Mountains

Image loading

Pipeline construction for Canmore Nordic Centre snowmaking system with excavation and equipment in Rocky Mountains

Image loading

Pipeline construction for Canmore Nordic Centre snowmaking system with excavation and equipment in Rocky Mountains

Image loading

Diver conducting underwater inspection of water intake system with turbidity curtain at Canmore Nordic Centre

Image loading

Diver conducting underwater inspection of water intake system with turbidity curtain at Canmore Nordic Centre

Image loading

Diver conducting underwater inspection of water intake system with turbidity curtain at Canmore Nordic Centre

Client

Alberta Forestry and Parks

Alberta Forestry and Parks

Capital Cost (CAD)

TBD

TBD

Location

Canmore, Alberta

Canmore, Alberta

Role/Position

Prime Consultant

Prime Consultant

Duration

May 2024

May 2024

Present

Present

Description

SweetTech Engineering was retained by Alberta Forestry and Parks to perform a detailed assessment of the existing snowmaking system at the Canmore Nordic Centre, followed by an upgrade program to the existing water intake, pumphouse, and snow making pipeline system.

The first phase of work included camera scoping (internal and external), an operational review, destructive cut-out testing, and corrosion allowance calculations. Based on the results of the testing program, SweetTech provided an assessment and recommendation report complete with cost estimations and life-cycle estimates. The recommendation report highlighted long and short-term priorities to repair, replace, upgrade, and/or maintain the various components of the snowmaking system.​

The second phase of the work focused on the multi-discipline design of a wholly new water pipeline for the snow making system, including the intake and fish screen, and the pumphouse process piping, valves, and instrumentation. As the project has moved into construction, SweetTech has also performed Tendering, construction monitoring, and construction contract administration.

SweetTech is leading the project team for the multi-year snow making system upgrade project, which is still ongoing.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Fish screen and intake pipe assembly for Canmore Nordic Centre snowmaking water system upgrade

Image loading

Fish screen and intake pipe assembly for Canmore Nordic Centre snowmaking water system upgrade
Fish screen and intake pipe assembly for Canmore Nordic Centre snowmaking water system upgrade

Image loading

Fish screen and intake pipe assembly for Canmore Nordic Centre snowmaking water system upgrade
Fish screen and intake pipe assembly for Canmore Nordic Centre snowmaking water system upgrade

Image loading

Fish screen and intake pipe assembly for Canmore Nordic Centre snowmaking water system upgrade
Fish screen installation being lowered into water within turbidity curtain at Canmore Nordic Centre intake

Image loading

Fish screen installation being lowered into water within turbidity curtain at Canmore Nordic Centre intake
Fish screen installation being lowered into water within turbidity curtain at Canmore Nordic Centre intake

Image loading

Fish screen installation being lowered into water within turbidity curtain at Canmore Nordic Centre intake
Fish screen installation being lowered into water within turbidity curtain at Canmore Nordic Centre intake

Image loading

Fish screen installation being lowered into water within turbidity curtain at Canmore Nordic Centre intake
Horizontal directional drilling equipment and turbidity curtain at Canmore Nordic Centre water intake construction site

Image loading

Horizontal directional drilling equipment and turbidity curtain at Canmore Nordic Centre water intake construction site
Horizontal directional drilling equipment and turbidity curtain at Canmore Nordic Centre water intake construction site

Image loading

Horizontal directional drilling equipment and turbidity curtain at Canmore Nordic Centre water intake construction site
Horizontal directional drilling equipment and turbidity curtain at Canmore Nordic Centre water intake construction site

Image loading

Horizontal directional drilling equipment and turbidity curtain at Canmore Nordic Centre water intake construction site
Upgraded pumphouse piping with valves and instrumentation for Canmore Nordic Centre snowmaking system

Image loading

Upgraded pumphouse piping with valves and instrumentation for Canmore Nordic Centre snowmaking system
Upgraded pumphouse piping with valves and instrumentation for Canmore Nordic Centre snowmaking system

Image loading

Upgraded pumphouse piping with valves and instrumentation for Canmore Nordic Centre snowmaking system
Upgraded pumphouse piping with valves and instrumentation for Canmore Nordic Centre snowmaking system

Image loading

Upgraded pumphouse piping with valves and instrumentation for Canmore Nordic Centre snowmaking system

Featured project media by SweetTech and Kalamoir staff.

Have a project you want to discuss?

Have a project you want to discuss?

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.