Our website has a new look

·

Our website has a new look

·

Drumheller Flood Program Environmental Management Service

·

Complete

·

Drumheller, Alberta

Image loading

Red Deer River with railway bridge and autumn riparian vegetation along badlands in Drumheller

Image loading

Red Deer River with railway bridge and autumn riparian vegetation along badlands in Drumheller

Image loading

Red Deer River with railway bridge and autumn riparian vegetation along badlands in Drumheller

Image loading

Winter conditions on Red Deer River with ice flows and frost-covered riparian vegetation near Drumheller

Image loading

Winter conditions on Red Deer River with ice flows and frost-covered riparian vegetation near Drumheller

Image loading

Winter conditions on Red Deer River with ice flows and frost-covered riparian vegetation near Drumheller

Client

Drumheller Resiliency and Flood Mitigation Office (DRMFO)

Drumheller Resiliency and Flood Mitigation Office (DRMFO)

Capital Cost (CAD)

$81.5 Million

$81.5 Million

Location

Drumheller, Alberta

Drumheller, Alberta

Role/Position

Environmental Consultant

Environmental Consultant

Duration

November 2022

November 2022

June 2024

June 2024

Description

Through a climate change adaptation and flood resiliency grant, the Town of Drumheller embarked on a $81.5 M flood protection program in 2020. Four engineering consulting firms were selected to design and manage 11 dike construction and improvement projects, all adjacent to the Red Deer River.

SweetTech Engineering was selected to manage and coordinate the regulatory approvals for all the consultants’ projects. This work included disturbance or improvements on public lands, private lands, along riparian zones, and the bed and banks of the Red Deer River. As a result, SweetTech conducted many public engagement sessions and consultations with numerous stakeholder groups to ensure successful delivery of this program. Alongside public engagement and stakeholder consultations, SweetTech has also provided regulatory strategy support, management and approvals coordination, and environmental assessments. Regulatory requirements included coordination with Alberta Environment and Protected Areas, Department of Fisheries and Oceans, and Transportation Canada. SweetTech was also responsible for Quality Assurance inspections and reporting regarding environmental compliance and erosion and sediment control measures on behalf of the client.


Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Please note: Project details are shared where agreements allow. Some specifics remain confidential and will be redacted. Content may be updated as work progresses or details become available.

Ice-covered Red Deer River with railway bridge and badlands backdrop in winter at Drumheller

Image loading

Ice-covered Red Deer River with railway bridge and badlands backdrop in winter at Drumheller
Ice-covered Red Deer River with railway bridge and badlands backdrop in winter at Drumheller

Image loading

Ice-covered Red Deer River with railway bridge and badlands backdrop in winter at Drumheller
Ice-covered Red Deer River with railway bridge and badlands backdrop in winter at Drumheller

Image loading

Ice-covered Red Deer River with railway bridge and badlands backdrop in winter at Drumheller
Red Deer River with riparian buffer and exposed badlands terrain along Drumheller flood protection corridor

Image loading

Red Deer River with riparian buffer and exposed badlands terrain along Drumheller flood protection corridor
Red Deer River with riparian buffer and exposed badlands terrain along Drumheller flood protection corridor

Image loading

Red Deer River with riparian buffer and exposed badlands terrain along Drumheller flood protection corridor
Red Deer River with riparian buffer and exposed badlands terrain along Drumheller flood protection corridor

Image loading

Red Deer River with riparian buffer and exposed badlands terrain along Drumheller flood protection corridor

Featured project media produced by SweetTech.

Have a project you want to discuss?

Have a project you want to discuss?

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.

Whether you are a large organization with a defined scope or a smaller operation exploring what support you need for a project, our team is here to help.